- Begin construction: Fall 2023
- Construction completion: Fall 2026
Note: This project schedule is tentative and subject to change due to the real estate acquisition process, construction bidding process, unforeseen delays in utility relocations and other factors. The schedule will be updated routinely on the City website.
BackgroundBuilt in 1934, Atlantic Intracoastal Waterway (AIWW) Deep Creek Bridge is a federally owned and operated two-lane bridge that crosses the Dismal Swamp Canal at U.S. Route 17 Business.
In October 1996, the approved initial appraisal concluded the bridge is functionally obsolete because of increasing traffic volumes, too narrow of a roadway and poor alignment with the connecting roads.
Replacing the bridge will improve traffic flow, meet Virginia Department of Transportation and City of Chesapeake requirements, and comes at a time in which road improvements are being made to either side of the bridge. The Norfolk District, U.S. Army Corps of Engineers plans to replace the Deep Creek Bridge with a five-lane roadway located 100 feet south of the existing bridge. Once construction is completed, the AIWW Deep Creek Bridge will be operated, maintained, and owned by the City of Chesapeake.
Replacement Project ScopeThe project, conducted by the U.S. Army Corps of Engineers, will replace the federally-owned Atlantic Intracoastal Waterway (AIWW) Deep Creek Bridge; a functionally obsolete two-lane split leaf bascule bridge; with a 144-foot long, 60-foot wide five-lane drawbridge. The project includes improvements to the approaching roadways.
(See larger resolution [JPG])
AuthorizationThe U.S. House of Representatives authorized the replacement of the AIWW Deep Creek Bridge as part of H.R. 1495, the Water Resources Development Act (WRDA) of 2007. WRDA is a bill dedicated to authorizing the activities of the U.S. Army Corps of Engineers.
CostApproximately $59.6 million
Maintenance of Traffic Sequence of Construction(View larger resolution [JPG])
Traffic Flow Improvement